Primavera P6 Professional Training Course Lebanon

Primavera P6 Professional for Engineers & Planners – Advanced Scheduling

Master Primavera P6 for real construction projects. Build detailed schedules, manage resources and costs, create and maintain baselines, update progress, analyze delays, and produce professional stakeholder reports. This course is designed for civil/mechanical engineers, construction managers, planners, and project controllers.

Duration: 30 hours

Teaching Methodology: Hands-on labs with real construction case studies

Course Schedule: Schedule

Fees: $450

Course Mode: Blended – Face-to-face or online via Zoom



DESCRIPTION

This advanced Primavera P6 course focuses on applying industry best practices in construction scheduling: detailed WBS and activities, logic and CPM analysis, resource/cost planning, baselines, progress updating, and reporting. Participants build and manage a full construction schedule end-to-end.

OBJECTIVES

  • Configure enterprise structures (EPS/OBS) and calendars for multi-project environments.
  • Build a detailed WBS; create advanced activity types and codes.
  • Develop robust logic; analyze float and the critical/near-critical paths.
  • Create resources (labor, equipment, materials), costs, and cost accounts; perform resource leveling.
  • Create/assign baselines; update progress with actuals; perform delay/recovery analysis.
  • Design layouts, filters, and dashboards; export professional reports.

PREREQUISITES

Basic project scheduling knowledge is required (Gantt, activities, relationships). Prior exposure to Primavera is helpful. Solid Excel skills recommended.

COURSE CONTENTS

01 - ENVIRONMENT & PROJECT SETUP

  • EPS & OBS structures; user preferences
  • Global, project, and resource calendars
  • Project codes and best-practice conventions

02 - WBS & ADVANCED ACTIVITIES

  • Detailed WBS development and coding
  • Activity types: Task/Resource Dependent, LOE, WBS Summary, Milestones
  • Constraints and user-defined fields (UDFs)

03 - RELATIONSHIPS & CPM ANALYSIS

  • Logic building; lags/leads; calendars impact
  • Float (total/free/negative) and critical path
  • Diagnosing logic issues; schedule quality checks

04 - RESOURCES & COST MANAGEMENT

  • Create labor, non-labor, and material resources
  • Rates, cost accounts, and budgeting
  • Assignments, histograms, and resource leveling

05 - BASELINES & PROGRESS UPDATING

  • Create and assign multiple baselines
  • Data Date, actuals, and % complete types
  • Variance, delay analysis, and recovery planning

06 - ADVANCED REPORTING & DASHBOARDS

  • Layouts, filters, group/sort, and saved views
  • Reporting wizard and custom reports
  • Exporting to Excel/PDF; stakeholder dashboards

07 - FINAL CONSTRUCTION CASE STUDY

  • Build a complete schedule: Residential Building or Road Project
  • Apply resources/costs, baseline, update progress
  • Produce executive reports and a recovery plan